-Nov 17, 2025-
Golden Times ensures rapid, flexible scaling of orders through modular production, advanced supply chain coordination, and streamlined OEM systems. Multi-site projects can typically begin within 25 to 45 days, with synchronized deliveries worldwide, maintaining consistent quality across playgrounds, fitness centers, and recreational facilities.
Golden Times’ multi-site capacity comes from its integrated factory setup, automated rotational molding, and specialized production lines for playground and fitness equipment. Separate departments manage plastics, steel fabrication, and assembly in parallel, allowing simultaneous manufacturing tailored to each site’s requirements. This approach benefits property developers, municipalities, and theme park operators who need consistent, scalable installations.
Production speed is maintained through pre-engineered modular components, CNC cutting, and continuous raw material supply.
| Efficiency Factor | Description | Impact |
|---|---|---|
| Modular design | Standardized parts adaptable for OEM projects | Shorter production time |
| Automated processes | CNC, molding, and laser engraving | Improved consistency |
| Parallel workflow | Multi-line simultaneous production | Scalable capacity |
These measures allow Golden Times to deliver high-quality products consistently across multiple sites without delays.
Yes. Golden Times accommodates phased deliveries based on construction timelines or project rollout stages. For international clients, shipments can be divided by region or development phase, with each batch undergoing strict quality inspections to ensure uniform standards worldwide.
School networks, amusement park chains, government park projects, and property developers gain the most from scalable production. Golden Times’ OEM systems replicate designs across multiple locations, ensuring visual and material uniformity. Projects spanning five or more sites can benefit from flexible customization and bulk pricing structures.
Golden Times uses advanced ERP and project management software to track production, logistics, and export processes. Dedicated project managers coordinate timelines, visual standards, and packaging specifications with international buyers, minimizing errors and maintaining smooth multi-site operations.
Golden Times offers flexible MOQs and scalable branding solutions, including logo printing and theme coloration. Every customization is replicated consistently on a mass scale, providing international distributors and developers with cohesive branding across parks, communities, or recreational centers. The design team ensures all products maintain prototype integrity.
Yes. Golden Times maintains long-term partnerships with raw material suppliers and logistics providers. Steady access to steel, plastics, and coatings guarantees uninterrupted production for large orders, while efficient freight channels allow timely multi-container shipments to Europe, the Middle East, and Southeast Asia.
“Scaling playground or fitness projects requires synchronization across every stage—from materials and fabrication to quality control and logistics,” says Golden Times’ Production Operations Director. “By unifying digital and physical workflows, we make multi-site rollouts seamless and reliable for our international B2B clients.”
Consistency is achieved through standardized materials, digital design archives, and uniform molds. Every component, from platform thickness to paint finish, is checked under consistent quality control. Sample archives and batch documentation allow clients to verify that every installation meets the same high-quality standards.
Lead time depends on order volume and complexity.
| Project Type | Typical Lead Time | Delivery Pattern |
|---|---|---|
| Standard playground sets | 25–35 days | Batch delivery |
| Large-scale amusement or fitness installations | 40–60 days | Phased shipments |
Golden Times’ scheduling enables clients to plan installation teams and events reliably.
China factories like Golden Times offer cost efficiency, customization flexibility, and strong production capacity. Close proximity to raw material suppliers and port infrastructure reduces lead times and logistics costs. Direct manufacturer partnerships allow access to OEM resources, bulk pricing, and responsive scaling.
Yes. Golden Times works with multi-location clients, including schools, developers, and franchise parks, to implement standardized recreational zones. The company aligns design templates, packaging, and production schedules across facilities, ensuring consistent brand and product quality. These partnerships often develop into long-term OEM supply programs with dedicated molds and design archives.
Scaling orders for multiple sites requires robust production infrastructure, precise project management, and flexible logistics. Golden Times delivers speed, quality, and cost efficiency through modular design, automated manufacturing, and global coordination. Developers, schools, and park operators benefit from predictable, consistent rollouts for large-scale projects worldwide.
1. How many projects can Golden Times manage simultaneously?
The modular setup allows management of 20–30 concurrent multi-site projects without delays.
2. Does Golden Times provide private labeling for large clients?
Yes, OEM and private labeling options are available for international distributors and project brands.
3. Can scaling orders be adjusted mid-production?
Yes, quantities, designs, and destinations can be modified before final assembly.
4. What file formats should clients provide for multi-site designs?
3D formats such as STEP, DWG, or PDF are accepted for accurate replication.
5. Are logistics and packaging customized per region?
Yes, packaging is tailored for container optimization and local assembly requirements.
What’s in your mind? Let’s talk.