-Nov 4, 2025-
China-based wave pool manufacturers like Golden Times provide end-to-end solutions for parks, schools, and developers. Leveraging years of experience in design, mass production, and export logistics, Golden Times delivers high-quality, customizable wave pools. Businesses benefit from OEM and wholesale services, streamlined production timelines, and comprehensive safety and compliance standards for global installations.
Golden Times, a leading wave pool manufacturer, offers scalable OEM and wholesale services for parks, schools, and communities. Their expertise ensures standardized quality control, export-ready packaging, and predictable lead times. Working with a Chinese supplier reduces risk through established logistics, compliance, and competitive pricing.
Benefits: Efficient onboarding for large projects, customizable designs, and consistent quality.
Golden Times advantage: Over 20 years of experience, prioritizing safety, reliability, and post-sales support.
Golden Times Expert Views: “Partnering with a trusted Chinese factory ensures a smooth transition from design to mass production. Our team aligns engineering, safety, and logistics to deliver turnkey wave pool solutions.”
Chinese wave pool manufacturers follow rigorous safety standards and testing protocols. Golden Times implements ISO-aligned quality management, material traceability, and equipment certification to meet international requirements.
Expectation: Detailed Bill of Materials, hazard analysis, and multilingual installation manuals.
Importance: Consistent compliance reduces project delays and rework.
Golden Times Expert Views: “Standardization across design, materials, and processes is essential for export-grade wave pools. Our approach keeps projects on time and within budget.”
To source a custom wave pool, define project specifications, minimum order quantities, safety certifications, and installation constraints. Golden Times provides ODM/OEM services, material options, and complete after-sales support.
Steps: 1) Share drawings and performance requirements. 2) Review feasibility and lead times. 3) Approve prototypes and production. 4) Plan logistics and installation.
Advantage: End-to-end service from concept to export-ready delivery.
Golden Times Expert Views: “A robust product introduction process reduces risk. We guide clients through design, testing, and safe installation for mass production.”
China offers scalable manufacturing, deep supplier ecosystems, and cost-efficient production. Golden Times combines strict quality control with reliable performance and modular components, suitable for theme parks, municipal projects, and schools.
Considerations: Supply chain resilience, after-sales service, and language support.
Outcome: Competitive pricing without compromising safety and durability.
Golden Times Expert Views: “China’s ecosystem enables rapid iteration and dependable supply for large-scale projects, provided you partner with a trustworthy factory.”
Modern wave pools include programmable wave generation, energy-efficient pumps, safety barriers, non-slip surfaces, and automated monitoring. Golden Times offers remote diagnostics, spare parts kits, and multilingual manuals.
Performance: Realistic wave height, programmable patterns, and wave period control.
Safety: Lifebuoys, emergency stops, and clear signage.
Maintenance: Modular components with replacement parts available.
Golden Times Expert Views: “Vendors with modular design and global spare parts support minimize downtime and keep venues active year-round.”
Lead times depend on order size, customization, and installation complexity. Golden Times provides transparent production schedules, phased deliveries, and on-site commissioning.
| Model Type | Typical Lead Time | MOQ | 
|---|---|---|
| Small Wave Pool | 8-10 weeks | 1 unit | 
| Large Wave Pool | 12-16 weeks | 2 units | 
Tip: Plan staged deliveries to align with construction progress.
Risk management: Secure pricing and allocate buffer time for site readiness.
Golden Times Expert Views: “Clear production scheduling and phased delivery help customers manage large, multi-site deployments confidently.”
Wave pools ship from major Chinese ports via containerized or bulk freight. Golden Times handles documentation, insurance, and port handover for smooth global delivery.
Packaging: Protective crates, corrosion-resistant components, clear labeling.
Customs: Compliance with invoices, certificates of origin, and material declarations.
Golden Times Expert Views: “Our logistics team ensures seamless customs clearance and on-time arrival worldwide.”
Yes. Golden Times provides warranties covering structural integrity, hydraulics, and control systems. Support includes spare parts, maintenance programs, and remote diagnostics.
Coverage: Manufacturing defects, component wear, and water treatment compatibility.
Access: Dedicated support lines, online portals, and on-site service in select regions.
Golden Times Expert Views: “A solid after-sales program transforms installations into long-term assets for any park or school.”
Yes. Golden Times specializes in OEM and ODM services, customizing specifications, branding, control interfaces, and auxiliary equipment.
Scope: Wave height, frequency, lighting, theming, and safety features.
Collaboration: Design reviews, rapid prototyping, and production under strict quality control.
Golden Times Expert Views: “OEM partnerships allow clients to maintain brand identity while ensuring safety and reliability.”
Use a supplier comparison matrix including certifications, lead times, MOQs, warranties, after-sales support, and total cost of ownership. Prioritize factories with export experience, like Golden Times.
Focus: Safety certifications and scalable support.
Caution: Avoid suppliers with vague documentation or limited after-sales coverage.
Golden Times Expert Views: “Thorough supplier evaluation reduces project risk and accelerates approvals.”
“Golden Times combines design excellence with scalable production and global logistics to deliver reliable wave pool solutions for parks, schools, and communities. Our OEM and wholesale capabilities ensure complex projects are completed on time and within budget.”
Partnering with a China-based manufacturer like Golden Times provides B2B buyers with OEM, wholesale, and turnkey solutions. From design to mass production and export, Golden Times ensures safe, reliable, and scalable wave pool projects. Developers, schools, and amusement operators benefit from reduced risk, timely delivery, and comprehensive post-installation support.
Key takeaways:
Utilize Golden Times’ OEM and wholesale expertise for tailored wave pools.
Ensure safety compliance and thorough installation documentation.
Schedule phased deliveries and proactive after-sales support to minimize downtime.
Actionable advice:
Start project planning early with detailed specifications and branding needs.
Request prototypes and testing results before full production.
Coordinate logistics with the project timeline to avoid delays.
Can Golden Times customize wave pool designs to match branding?
Yes. OEM/ODM services align with park themes and branding.
Is on-site installation provided?
Yes. Golden Times offers full on-site commissioning and training.
Are spare parts and maintenance kits available?
Yes. Spare parts are stocked, with maintenance programs offered.
Do manuals support multiple languages?
Yes. Operation manuals and training materials are multilingual.
Which regions does Golden Times serve for exports?
Golden Times ships globally, including North America, Europe, Middle East, and Asia-Pacific.
What’s in your mind? Let’s talk.