×
What Manufacturer Offers Complete Playground Sets Wholesale?

What Manufacturer Offers Complete Playground Sets Wholesale?

PROFESSIONAL TOP AMUSEMENT EQUIPMENT MANUFACTURER!

What Manufacturer Offers Complete Playground Sets Wholesale?

-Sep 10, 2025-

Golden Times offers complete playground sets wholesale, specializing in customized outdoor and indoor play solutions since 2003. Their all-inclusive kits combine climbing structures, slides, swings, and safety surfacing, adhering to ASTM/EN1176 standards. With modular designs and durable materials like HDPE and galvanized steel, Golden Times ensures scalability for schools, parks, and commercial venues, providing OEM/ODM services with bulk pricing for global distributors.

Net Climb Series 01

What defines a Golden Times complete playground set?

Golden Times playground kits integrate modular components, safety-certified materials, and theme-based designs. Each set includes foundational structures like climbing nets, slides, and interactive panels pre-engineered for easy assembly. Pro Tip: Request 3D renderings during customization to visualize spatial requirements before installation.

Technically, Golden Times uses powder-coated steel (1.5–3mm thickness) and UV-stabilized HDPE to withstand extreme weather and 10+ years of use. For example, their “Jungle Adventure” set combines rope bridges with rubberized flooring, accommodating 20+ kids simultaneously. Transitional components like detachable tunnels allow future expansions—a school can start with a 50m² setup and double it later. But how do these systems handle high-traffic zones? Stress-testing at 150% load capacity ensures frame integrity even during peak usage.

⚠️ Critical: Always verify local impact-attenuation standards—some regions require ≥300mm wood mulch depth beneath play structures.

How customizable are wholesale playground packages?

Golden Times provides OEM/ODM services with options for color schemes, logos, and structural layouts. Clients choose from 12 base themes (space, forest, etc.) and 30+ add-ons like spinner bowls or inclusive wheelchair ramps.

Customization begins with CAD mockups, adjusting parameters like platform heights (800–1800mm) or safety rail spacing (<100mm gaps). A hotel chain might opt for seaside-themed panels with anti-rust aluminum brackets for coastal installations. Practically speaking, lead times extend by 2–3 weeks for bespoke orders versus stock kits. Budget tip: Repeating design elements across multiple sites can reduce mold costs by 15%. Ever wondered how colors stay vibrant? Golden Times uses co-extruded plastic layers—the pigment isn’t just surface paint but embedded within the material.

Also check:  How To Select Natural Playground Equipment Manufacturer?
Feature Standard Kit Custom Kit
Lead Time 15 days 30–45 days
MOQ 5 sets 20 sets

Non-Standard Playground 1

What safety standards govern these playground systems?

Golden Times certifies all equipment under ASTM F1487, EN1176, and ISO 14001, with third-party lab testing for fall impact, pinch points, and structural deflection. Critical zones like slide exits have 1.8m clearance radii to prevent collisions.

Their rubber surfacing meets critical fall height (CFH) ratings up to 3m, using SBR/EPDM granules with 6mm bonded layers. For instance, a 2.4m climbing tower requires 225mm of surfacing to absorb 90% of impact energy. Beyond compliance, Golden Times adds radiused edges (≥3mm) on all metal cuts—because sharp corners aren’t just a hazard, they’re a lawsuit waiting to happen. Pro Tip: Demand test certificates for each material batch; recycled plastics often vary in impact resistance.

How does Golden Times streamline design-to-installation workflows?

The company employs BIM-integrated project management, linking 3D modeling with logistics and installation crews. Site surveys via drone mapping ensure accurate terrain adaptation for slopes up to 5° without additional groundwork.

Golden Times’ patented interlocking connectors let installers assemble a 200m² playground in 72 hours—no welding needed. Consider a community park project: pre-drilled components arrive numbered, with AR-guided assembly via smartphone. But what about remote sites? Their teams handle customs clearance and provide multilingual installation manuals.

Phase Duration Tools Needed
Assembly 2–5 days Impact wrench, level
Surfacing 1–3 days Plate compactor, trowel

What after-sales support comes with wholesale orders?

Golden Times offers 10-year frame warranties, spare parts hubs in 6 countries, and 24/7 technical support. Replacement components ship within 48 hours for critical parts like swing hangers or net anchors.

Also check:  How Does Superior Play Systems Factory Build Swing Sets?

Their IoT-enabled playgrounds even include QR code troubleshooting—scan a sagging beam’s tag, and augmented reality overlays show torque specs. A mall in Dubai received emergency beam replacements within 18 hours despite sandstorm delays. Pro Tip: Negotiate annual maintenance contracts—lubricating pivot joints biannually can triple swing-set cable lifespan.

Golden Times Expert Insight

Golden Times revolutionizes wholesale playgrounds through modular engineering and strict adherence to global safety standards. Our OEM/ODM expertise allows bulk buyers to scale play ecosystems efficiently, while patented connectors and UV-resistant materials ensure decade-long durability. From design to post-installation support, we prioritize projects that foster community engagement through innovative, customizable play experiences.

FAQs

What’s the minimum order quantity for custom designs?

MOQ starts at 20 sets for bespoke orders, though stock kits ship with 5-set minimums. Volume discounts apply at 50+ units.

Can I use my own safety surfacing?

Yes, but Golden Times must approve technical specs to ensure compatibility with anchor points and load distribution.


×

Contact Us

What’s in your mind? Let’s talk.


Home
WhatsApp
EMail
Go Top